<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="8339">
 <titleInfo>
  <title>New employee and new leader training scheduling &amp; reporting information system using graph coloring method (case study:</title>
  <subTitle>pt. chevron pacific indonesia)</subTitle>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>MONA SAPUTRI</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <name type="Personal Name" authority="">
  <namePart>1255301402</namePart>
  <role>
   <roleTerm type="text">Additional Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Pekanbaru</placeTerm>
   <publisher>Pustaka Politeknik Caltex Riau</publisher>
   <dateIssued>2016</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Text</form>
  <extent>Jumlah Halaman : 73 | Ukuran : 20x15</extent>
 </physicalDescription>
 <note>ABSTRACT&#13;
New employee and leader trainings are mandatory development&#13;
programs in PT. CPI. There are constraints needed to create a&#13;
schedule. The hard constraint is that targets must receive schedule&#13;
before deadlines. The soft constraints are: training is held in location&#13;
with most participants(1), participants get minimum 2 schedules (2),&#13;
minimum participant for each class = 12 (3), maximum = 30 (4). In&#13;
current practice, targets receive 1 schedule and sometimes pass their&#13;
deadline. Another issue is data management. Data is managed in&#13;
separated spreadsheet. There’s possibility for human error, and it&#13;
takes time to generate reports (1-2 days). Graph coloring using&#13;
Welsh-Powell algorithm is able to fulfill the hard constraint. But&#13;
schedules provided by the system are not flexible. Some targets get&#13;
the schedule too early and some targets get schedule that too close to&#13;
deadlines. Recommended training schedules occur on the same&#13;
month every year. Based on the testing result, there is no violation to&#13;
hard constraint, soft constraint 1, soft constraint 2 and soft constraint&#13;
4. There is violation for soft constraint 3. Welsh-Powell algorithm is&#13;
not able to provide a proper group to generate schedule. Human&#13;
interfere is needed in order to create a proper schedule.&#13;
Key word: graph coloring, welsh-Powell algorithm, training&#13;
scheduling</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>PA Teknik Informatika</topic>
 </subject>
 <classification>PA TI</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>Politeknik Caltex Riau Politeknik Caltex Riau</physicalLocation>
  <shelfLocator>PA TI</shelfLocator>
  <holdingSimple>
   <copyInformation>
    <numerationAndChronology type="1">PA1255301402</numerationAndChronology>
    <sublocation>Perpustakaan PCR (Rak R)</sublocation>
    <shelfLocator></shelfLocator>
   </copyInformation>
  </holdingSimple>
 </location>
 <slims:digitals/>
 <recordInfo>
  <recordIdentifier>8339</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">2019-03-21 00:00:00</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2021-07-06 14:27:44</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>